Large SA179 U-bend bundles from tube over sixty feet long.

An industrial heat exchanger project needed large SA179 U-bend bundles with complex geometry, bent from straight tubes longer than 60 feet. Over nine months Ameritube coordinated sourcing, supplier qualification, procurement, technical review, quality verification, and delivery of customer-ready bundle components.

The challenge

  • Long-length SA179 tubing, over 60 feet straight before bending.
  • Complex U-bend geometry in large bundle assemblies.
  • Multi-stage qualification and coordination between the customer, the exchanger fabricator, and suppliers.
  • Schedule-sensitive delivery and customer-ready documentation.

How the project ran

  1. Technical review and quote development.
  2. Supplier qualification and sourcing.
  3. Procurement and production planning.
  4. Material certification review.
  5. 100% eddy current and dimensional verification on the straight tubes.
  6. U-bending, stress relief of the bends per customer specification, and bend verification.
  7. Packaging and logistics coordination.
  8. Final delivery of completed bundles.

Quality documentation

Product test report confirming material compliance, eddy current test report, dimensional inspection report, bending inspection and bend geometry report, all organised into one package for customer release.

The result

A 9-month program completed, ready-for-installation bundle components delivered, and a demonstrated capability in large heat exchanger bundle work.